chore(deps): update velero/velero-plugin-for-aws docker tag to v1.14.1 #13

Open
renovate-bot wants to merge 1 commit from renovate/velero-velero-plugin-for-aws-1.x into main
Member

This PR contains the following updates:

Package Update Change
velero/velero-plugin-for-aws patch v1.14.0v1.14.1

⚠️ Warning

Some dependencies could not be looked up. Check the Dependency Dashboard for more information.


Release Notes

vmware-tanzu/velero-plugin-for-aws (velero/velero-plugin-for-aws)

v1.14.1

Compare Source

All changes

Configuration

📅 Schedule: (in timezone America/Toronto)

  • Branch creation
    • "after 19:00 on friday"
  • Automerge
    • At any time (no schedule defined)

🚦 Automerge: Disabled by config. Please merge this manually once you are satisfied.

Rebasing: Whenever PR becomes conflicted, or you tick the rebase/retry checkbox.

🔕 Ignore: Close this PR and you won't be reminded about these updates again.


  • If you want to rebase/retry this PR, check this box

This PR has been generated by Mend Renovate.

This PR contains the following updates: | Package | Update | Change | |---|---|---| | [velero/velero-plugin-for-aws](https://github.com/vmware-tanzu/velero-plugin-for-aws) | patch | `v1.14.0` → `v1.14.1` | --- > ⚠️ **Warning** > > Some dependencies could not be looked up. Check the [Dependency Dashboard](issues/1) for more information. --- ### Release Notes <details> <summary>vmware-tanzu/velero-plugin-for-aws (velero/velero-plugin-for-aws)</summary> ### [`v1.14.1`](https://github.com/velero-io/velero-plugin-for-aws/releases/tag/v1.14.1) [Compare Source](https://github.com/vmware-tanzu/velero-plugin-for-aws/compare/v1.14.0...v1.14.1) ##### All changes - Bump Velero to v1.18.1-rc.1 ([#&#8203;292](https://github.com/vmware-tanzu/velero-plugin-for-aws/issues/292), [@&#8203;blackpiglet](https://github.com/blackpiglet)) - Bump Golang to 1.25.9 and go.mod to fix CVEs. ([#&#8203;291](https://github.com/vmware-tanzu/velero-plugin-for-aws/issues/291), [@&#8203;blackpiglet](https://github.com/blackpiglet)) </details> --- ### Configuration 📅 **Schedule**: (in timezone America/Toronto) - Branch creation - "after 19:00 on friday" - Automerge - At any time (no schedule defined) 🚦 **Automerge**: Disabled by config. Please merge this manually once you are satisfied. ♻ **Rebasing**: Whenever PR becomes conflicted, or you tick the rebase/retry checkbox. 🔕 **Ignore**: Close this PR and you won't be reminded about these updates again. --- - [ ] <!-- rebase-check -->If you want to rebase/retry this PR, check this box --- This PR has been generated by [Mend Renovate](https://github.com/renovatebot/renovate). <!--renovate-debug:eyJjcmVhdGVkSW5WZXIiOiI0My4xOTAuMSIsInVwZGF0ZWRJblZlciI6IjQzLjE5MC4xIiwidGFyZ2V0QnJhbmNoIjoibWFpbiIsImxhYmVscyI6W119-->
This pull request can be merged automatically.
This branch is out-of-date with the base branch
You are not authorized to merge this pull request.
View command line instructions

Checkout

From your project repository, check out a new branch and test the changes.
git fetch -u origin renovate/velero-velero-plugin-for-aws-1.x:renovate/velero-velero-plugin-for-aws-1.x
git switch renovate/velero-velero-plugin-for-aws-1.x

Merge

Merge the changes and update on Forgejo.

Warning: The "Autodetect manual merge" setting is not enabled for this repository, you will have to mark this pull request as manually merged afterwards.

git switch main
git merge --no-ff renovate/velero-velero-plugin-for-aws-1.x
git switch renovate/velero-velero-plugin-for-aws-1.x
git rebase main
git switch main
git merge --ff-only renovate/velero-velero-plugin-for-aws-1.x
git switch renovate/velero-velero-plugin-for-aws-1.x
git rebase main
git switch main
git merge --no-ff renovate/velero-velero-plugin-for-aws-1.x
git switch main
git merge --squash renovate/velero-velero-plugin-for-aws-1.x
git switch main
git merge --ff-only renovate/velero-velero-plugin-for-aws-1.x
git switch main
git merge renovate/velero-velero-plugin-for-aws-1.x
git push origin main
Sign in to join this conversation.
No reviewers
No labels
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference
public/ops.emnt.dev!13
No description provided.